Pre-handover (PCI) inspection in Clyde North

The finished house inspected room by room, with the roof seen from the air, before you pay the last claim.

  • About two weeks out from the handover appointment
  • 2 to 3 hours on site
  • Report within 24 hours
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage7 of 7
When to bookAbout two weeks out from the handover appointment
Time on site2 to 3 hours on site
Inspected againstThe VBA Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Clyde North pre-handover (PCI) inspection

  • Roof tiles, capping and flashings by drone
  • Roof space ducts, insulation and truss repairs
  • Door thresholds and water stops
  • Balcony hobs, balustrade fixings and height
  • Bath hobs and shower screens
  • Weep holes clear above finished ground
  • Drains and pits free of builder's debris
  • Bottom plates and slab edges at the garage
  • Boundary walls sealed and finished
  • Doors, windows and locks worked by hand
  • Paint, plaster and tiling against the tolerances
  • Joinery, benchtops and fittings aligned
  • Paving and grading falling away
  • Penetrations through external walls sealed
Why it matters here

Pre-handover (PCI) inspections on Clyde North builds

At handover the items we record in Clyde North cluster in three places. On the roof: cracked tiles, unfinished hip capping, vent flashings needing sealing. At the doors and balconies: water stops that stop short, balustrades bolted through the hob. In the roof space: ducts loose or never joined and trusses repaired by improvisation. Most owners never see any of these from the ground.

What we find at this stage in Clyde North

  • Cracked roof tiles
  • Truss repairs not to an approved detail
  • Water stop broken at the door jambs
  • Vent flashings damaged
  • Weep holes blocked with mortar
Weep holes plugged with mortar, blocking drainage and airflow in the cavity, found during a pre-handover inspection in Clyde North
Weep holes filled with mortar at handover
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Clyde North

Annotated findings from Pre-handover (PCI) inspections.

Cracked roof tiles spotted from the drone at handover, open to rain, found during a pre-handover inspection in Clyde North
Cracked roof tiles spotted from the drone at handover, open to rain
Damaged roof truss patched with a repair that does not match an approved detail, found during a pre-handover inspection in Clyde North
Damaged roof truss patched with a repair that does not match an approved detail
Water stop angle broken at the door jambs where the membrane should continue, found during a pre-handover inspection in Clyde North
Water stop angle broken at the door jambs where the membrane should continue
Roof vent flashing damaged and needing resealing before the keys change hands, found during a pre-handover inspection in Clyde North
Roof vent flashing damaged and needing resealing before the keys change hands

The other stages of a Clyde North build

  1. Bored piers inspection in Clyde North1Bored piersWith the holes bored and cages ready, before the concrete arrives
  2. Slab pre-pour inspection in Clyde North2Slab pre-pourSteel tied and formwork set, the day before the pour
  3. Frame inspection in Clyde North3FrameWalls and trusses standing, roof cover on, nothing lined
  4. Lock-up (pre-plaster) inspection in Clyde North4Lock-up (pre-plaster)Cladding, roof and external doors complete, services roughed in, before plaster
  5. Fixing inspection in Clyde North5FixingPlaster, doors and joinery in, before painting starts
  6. Waterproofing inspection in Clyde North6WaterproofingOnce the membrane has cured and before the tiler arrives

All construction stage inspections in Clyde North →

Guides

Construction stage guides for Clyde North

All guides →

Book a pre-handover (pci) inspection in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Clyde North: common questions

Is PCI the same as handover?

Practical completion is when the builder says the work is finished. The inspection happens just before handover so the defects can be listed and fixed before you take the keys.

What happens to the defect list?

You pass it to the builder, who should respond item by item. Items they will not fix should be noted in writing before you pay.

Do you test the heating, hot water and appliances?

No. We check they are installed and look complete, and operate doors, windows and taps by hand. Commissioning and testing belong to the licensed trades.

How many hours does a Clyde North handover inspection run?

Three to four hours on most Clyde North double storeys, less on a single storey.

Can I attend?

Yes. Coming for the end of the inspection lets the inspector show you the main items in person.

My builder refuses a handover item. Where do I go?

Put your request in writing. If it stays unresolved, the Building and Plumbing Commission's dispute resolution service (formerly DBDRV) and then VCAT are the paths in Victoria.