Lock-up inspection in Clyde North

Flashings, sarking and the frame are checked after cladding goes on and before plaster covers the walls.

  • Cladding, roof and external doors complete, services roughed in, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteTell us the stage or the property and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookCladding, roof and external doors complete, services roughed in, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Clyde North lock-up (pre-plaster) inspection

  • Head and sill flashings to every window
  • Sarking under the roof covering
  • Bracing left whole after the trades
  • Bottom plates not notched beyond limits
  • Studs bearing fully on their plates
  • Frame items from the last visit rechecked
  • Ducts run without crimps and supported
  • Pipes capped and clipped clear of framing
  • Brickwork and cladding to the plans
  • Weep holes and cavity left open
  • External doors and frames fixed
  • Penetrations through the cladding sealed
  • Insulation present where walls are open
Why it matters here

Lock-up (pre-plaster) inspections on Clyde North builds

Lock-up in Clyde North is where the weather details get missed. We regularly find window openings with no flashing behind the brickwork, tiled roofs without sarking, and bracing cut through by a trade making room for a pipe or duct. Frame items from the previous visit also turn up here unfixed, and this is the last time anyone can see them.

What we find at this stage in Clyde North

  • Window openings without flashing
  • Sarking left out under the roof tiles
  • Bracing cut to run services
  • Bottom plate notched too deeply
  • Frame stage items still not fixed
No sarking under the tiled roof, removing the backup barrier to driven rain, found during a lock-up inspection in Clyde North
Tiled roof going on without sarking underneath
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Clyde North

Annotated findings from Lock-up (pre-plaster) inspections.

Wall bracing cut through, removing resistance to wind load until it is restored, found during a lock-up inspection in Clyde North
Wall bracing cut through, removing resistance to wind load until it is restored
Window openings with no flashing installed before the cladding went on, found during a lock-up inspection in Clyde North
Window openings with no flashing installed before the cladding went on
Studs not sitting fully on the bottom plate, so load does not pass down properly, found during a lock-up inspection in Clyde North
Studs not sitting fully on the bottom plate, so load does not pass down properly
Load bearing bottom plate notched past two thirds of its depth, found during a lock-up inspection in Clyde North
Load bearing bottom plate notched past two thirds of its depth

The other stages of a Clyde North build

  1. Bored piers inspection in Clyde North1Bored piersWith the holes bored and cages ready, before the concrete arrives
  2. Slab pre-pour inspection in Clyde North2Slab pre-pourSteel tied and formwork set, the day before the pour
  3. Frame inspection in Clyde North3FrameWalls and trusses standing, roof cover on, nothing lined
  4. Fixing inspection in Clyde North5FixingPlaster, doors and joinery in, before painting starts
  5. Waterproofing inspection in Clyde North6WaterproofingOnce the membrane has cured and before the tiler arrives
  6. Pre-handover (PCI) inspection in Clyde North7Pre-handover (PCI)About two weeks out from the handover appointment

All construction stage inspections in Clyde North →

Guides

Construction stage guides for Clyde North

All guides →

Book a lock-up (pre-plaster) inspection in Clyde North

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Clyde North: common questions

Why are window flashings so important?

Brick veneer lets some water through by design. The flashing catches it above and below the window and sends it out through the weep holes. Without it, the water runs into the frame and the plaster.

Is sarking compulsory?

That turns on the roof type, the wind class and your specification. Where it is specified or required and missing, it is recorded as a defect.

What do you do about cut bracing?

Record it with a photo and location and ask the builder to reinstate it to the engineer's detail. Bracing is part of the structure, not a lining.

Do you check plumbing and electrical rough-in?

Only for visible clashes with the frame, such as bracing cut or plates notched to fit them. Testing and compliance of the services belong to the licensed plumber and electrician.

How long does the lock-up visit run?

Around two hours, more on a double storey.

Can lock-up be combined with another stage?

It works best on its own, because it has to happen after the cladding and before the plaster, which is usually a narrow window.